Park Ten Wastewater Treatment Plant Tunneling
Location: Houston, TX
Client: Reytec Construction
Project Dates: In Progress
Contract Value: $3.6 Million
Summary
• Install 42” Tri-loc casing using Micro Tunneling methodology (1734)
• Contact Grout annulus of 42” casing
• Install 28” FRP Sanitary Sewer using Micro Tunneling methodology (3191 LF)
• Contact Grout annulus of 28” casing
PROJECT OVERVIEW
This micro tunneling project consists of installing 1734 LF of 42” and associated contact grouting annulus. Additionally, BRTG’s scope includes the installation of 3191 LF of 28” FRP Sanitary Sewer using micro tunneling. A sump pump will be provided if necessary for shaft work, mobilization between shafts, and bringing spoils to the surface. Thrust blocks will be installed with entry and exits seals as required. Daily surveyor control is provided to Reytec, along with a surveyor to collaborate with Reytec’s surveyor to ensure accurate location confirmation prior to commencement.